Prefabricated bathrooms

Manufacturing of prefabricated bathrooms

In the beginning there is always planning

Before the manufacturing of the prefabricated bathroom, the important step is the preparation phase including the planning, selection of materials, coordination with the investor and construction designer.

 

Our project manager will be at your disposal from the very beginning of the cooperation up to the putting your project into operation.

PREPARATION
OF SHEETING

As our prefabricated bathrooms are made always in connection with the specific project and on the basis of individual requirements of the investor, steel sheeting must be made before the series manufacturing.

produkcia-debnenie
produkcia-armovanie

ARMOURING

The fixation of the concreting reinforcement will ensure the necessary static characteristics. In this step, distributions of water, waste and electric energy are installed.

CONCRETING

Concrete of the rigidity class C35: 2 400 kg/m³ is poured to the sheeting
or concrete of the rigidity class LC 25: 1 800 kg/ m³.

produkcia-betonovanie
produkcia-spajanie

CONNECTING
OF ELEMENTS

During the production, the individual wall elements will be connected in watertight manner and will make one robust piece.

HYDROINSULATION
AND FACING

The floor as well as the necessary wall areas (shower) will be painted by water resistant insulation mass before the facing which will prevent the unwanted damages. The wall facing and floor are laid to the bed made of flexible glue. The selection of the facing, floor material and the jointer will be done by the investor. The corners and connections are treated by elastic binder.

produkcia-obklad
produkcia-maliarskeprace

PAINTING
WORKS

The ceiling and walls without facing are treated by binder, paintwork wallpaper and dispersion paint. The outer walls, visible after the installation, enable the treatment by paints and wallpapers due to their surface treatment.

INSTALLATION OF SANITARY EQUIPMENT AND EQUIPMENT ELEMENTS

The sanitary equipment and other equipment elements of the bathroom are installed during the finalisation to the bathroom pod wall and are connected by the individual installation distributions.

produkcia-sanita
produkcia-final

FINAL
PRODUCT

The finished prefabricated bathroom is verified within the company internal checks in all aspects of aestheticism and functionality. Then, it is ready to be delivered.

TRANSPORT
AND INSTALLATION

The completely finished prefabricated bathroom is locked and packaged during the transport and is thus protected from unwanted external impacts. The delivery of the prefabricated bathrooms on trucks is planned just in time in cooperation with the construction management. The course of installation is as simple as the delivery of the prefabricated bathroom to the construction site. It will be taken by the crane directly from the truck to the specific floor and installation place. The bathroom installation to the final place may be done in 30 minutes.

 

The prefabricated bathrooms may be installed also additionally by pushing through the façade or if necessary the can be installed as a statically self-bearing tower before the building façade is made.

produkcia-transport
In case you are interested, do not hesitate to contact us